The renovations, including a new roof, at BMO Field are almost complete and Toronto FC is giving fans sweeping aerial views of how the project is coming along.
With a combination of overhead drone footage and on-the-ground video, Toronto FC released a behind-the-scenes look at the final stages of the $150 million face-lift. The renovations include a new canopy roof over the stands on three sides, plus a new lighting and sound system.
TFC is in the midst of an eight-game road stretch while the construction at BMO Field wraps up before their May 7 season opener.
Watch the video below: